Zaoqiang County People’s Hospital

  • Floor area 60,091㎡
  • Energy saving rate 25%
Share

Zaoqiang County People’s Hospital was built in 1945, with superior conditions, beautiful environment and convenient transportation. It is a grade 2A hospital, covering area of 54,669 ㎡and construction area of 60,091㎡, including comprehensive building of outpatient, medical  technology, inpatient ward, and logistics support building. There is also equipped with a 5,900㎡patient recreation garden and a 600 car-parking spot.

Energy-saving technologies mainly used:

  • Energy management platform;
  • Intelligent fully automatic operation;  
  • Multiple energy saving strategies;
  • Intelligent optimization algorithm;
  • Linkage between terminal and energy end

Equipped with above technologies in the system, Energy consumption can be reduced with extra 20% on the basis of energy saving of ground-source system;

Besides, the system use Climate Compensation Technology and Technology of Different Temperature in Different Time Period intensively, which could greatly improve energy-saving rate. Comprehensive energy saving rate could reach 25%.

Get A Free Quote
Online Whatsapp Message Email