Zaoqiang County People’s Hospital was built in 1945, with superior conditions, beautiful environment and convenient transportation. It is a grade 2A hospital, covering area of 54,669 ㎡and construction area of 60,091㎡, including comprehensive building of outpatient, medical technology, inpatient ward, and logistics support building. There is also equipped with a 5,900㎡patient recreation garden and a 600 car-parking spot.
Energy-saving technologies mainly used:
Equipped with above technologies in the system, Energy consumption can be reduced with extra 20% on the basis of energy saving of ground-source system;
Besides, the system use Climate Compensation Technology and Technology of Different Temperature in Different Time Period intensively, which could greatly improve energy-saving rate. Comprehensive energy saving rate could reach 25%.
The project adopts ground source heat pump system for heat- ing and cooling
Construction area 65,000 square meters, including 39,000 square meters for the Old town
In 2017, Sanzen Energy was authorized to implement this rectification project.