Construction area 65,000 square meters, including 39,000 square meters for the Old town
Government Office, with Build I, II, III in 8700 square meters separately.
Project renovation includes: Intelligent energy-saving control system of central air conditioning + Intelligent lighting control system + Photovoltaic capacity of 76KW+ Replacement of energy-saving water heaters and water-saving appliances
Use: Internet + Energy Control Platform
Energy-saving Technology adopted:
Energy management platform;
Intelligent automatic operation;
Variety of energy saving strategies;
Intelligent optimization algorithm;
Match between air conditioning terminal and cooling machine.
Energy Efficient:
Multi-on-line air conditioning system: average energy saving rate is 40.98%,