Beijing Nord Plaza Phase II Project

  • Building Area 200000m²
  • Energy Saving 31%
  • Cost Saving CNY 860000
Share

In 2017, Sanzen Energy was authorized to implement this transformation project. After comprehensive survey, we reformed the system by installing sensing equipment and self-developed centralized controllers to make it operate in intelligent automatic mode, ensuring highest energy utilization.

  • Construction area 200,000 square meters. Office, hotel, shopping malls and other comprehensive business centers.
  • Fully automated intelligent operation + Multi-energy monitoring + Internet energy control
  • Achieving comprehensive energy saving rate 31.3%;
  • Saving 772,523.96 KWH of electric energy in summer, about 863,000 CNY.
NameElectric Energy (Kw.h)Electricity Charge (CNY)CO2(Kg)Standard coal(Kg)Emission  Reduction  of inhalable particles (Kg)
Before modification2492012.782747603.832788761.661006773.168054.19
After transformation1719488.821895846.651924245.55694673.485557.39
Annual savings772523.96851757.19864516.12312099.682496.8

In 2018, the project was selected as the energy saving subsidy project of Beijing Commission of Housing and Urban-rural Development, realizing the overall building energy saving of 15%-20%. It would receive 30 CNY/㎡ as subsidy, totally more than 6 million CNY from government for energy saving.

In 2019, Nord Property entrusted Sanzen Energy to carry out energy-saving transformation for the newly completed phase III project of 300,000 square meters and phase I project of 100,000 square meters.

Get A Free Quote
Online Whatsapp Message Email